At BIBA Manchester 2025, SQM delivered its largest Kinetic LED Wall P1.9 setup to date. The installation combined precise motion control with high-resolution LED panels, creating a dynamic visual environment that changed in sync with the event content.
The success of the project was driven by close collaboration with the client’s creative team, whose content was designed specifically to take advantage of kinetic LED capabilities. SQM provided full technical delivery, including system integration, motion programming, LED installation and on-site operation.
Technical delivery overview:
P1.9 KINETIC LED WALL - motion programming based on the delivered content